Masud Kayani

Material Specialist / QA/QC Manager

Curriculum Vitae-------- Masud Akhtar Kiani
Contact No +97150-7327690 Email: [email protected]
Experience
: 30 years
Profession
:Material Specialist / QA/QC Manager
Position
: Regional Quality / Material Manager
Nationality
: Pakistani
Languages
: English, Arabic, Urdu, Medium Greek.
Computer skills
: MS Office, Excel, Auto CAD,Aconex System.
Safety Courses
: Nebosh, Confined space & Construction site.
Driving Licence
: Posses valid UAE Driving Licence # 2
Contact Abroad
: Postal code 12480 Harighel AK Pakistan
+923454467699 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Academic and professional Qualifications / Certifications
B.Sc.
: Engineering Geology, from University of Punjab, Pakistan
M.Sc.
: Civil Engineering from Grant Town University Berkeley, California, USA (Online).
Material testing Course
: Soil Mechanics Testing Course, Institute of Sind Technology, Pakistan
PGDMM (2010)
: Post Graduate Diploma (3 Years) in Material Management from wisdom Institute Abu Dhabi
ISO 9001 (2008)
ISO 9001 (2008)
ISO 9001 (2000)
: Lead Auditor Course –IRCA-QMS-ISO 9001 2008 & 2015 approved by IRCA in July 2014 & 2017
: Internal Auditor Course-IRCA-IMS- ISO 9001 2008 & 14001,OHSAS 18001 in 2010
: Internal Auditor Course –IRCA-QMS from BVQ for ISO 9001 & 14000 in Feb, 2002
Concrete Workshop
: Total Quality Management Course 40 hours by Society of Engineer Abu Dhabi UAE
Certified Quality Manager
: Certified Quality Manager Course (CQM) 40 hours by Chicago Training Institute AD.
Licensed Engineer
: ASQ Registration for Licensed Engineer & Certification.
PMP Certification
: Project Management Professional Certification Course (under Process).
Six Sigma Course
: Six Sigma Green Belt Course (under process).
CMAA Membership : Construction Management Association of America (CMAA)--Member ship ID # is 181537 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxX CakKey experience
 To establish and activate Project Quality Plan and procedures with Project staff.
 Preparation of inspection and test plans and check lists for site activities.
 Preparation of Method statements for various installations in accordance with contract specifications.
 Ensuring inspection of material received at site after receiving information from stores in charge.
 Laboratory Management &. Infrastructure activities dealing in accordance to contract specification
 Testing, Inspection and Evaluation of Civil, Electrical and Mechanical products for approval purposes.
 Assistant Resident Engineer for Materials, Infra, sewerage, drainage, irrigation lines, & solid waste treatment plant.
 Overall assistance to the Integrated Management , Generating the Annual Audit Plan , Conducting IMS Internal & External Auditing for Vendors, Manufacturers, Sub contractors & suppliers etc.
 Implementing best practice Enhancing quality, Analysing feedback of Quality Issues.
 Conduct Concrete and Asphalt mix design from initial stage to final stage.
 Testing & Commissioning of Sewerage Treatment Plant facilities as SST, PST, SSD, PSD, EST, Aeration Tank & HW.
 Review & approval of Material submittals, Method statements, PQP, Quality Plans /Technical proposals.
 NCR (Issue, Review & closed procedure), ITP review and implements for execution.
 Experience in Road, Bridges, Villas, Commercial & Industrial Buildings, Jetty, Airport, Tunnel, Infrastructure, ADSSC Overview and normal Sewer projects / Sewerage Treatment plant Project.
 Occasional contacts with other to co-ordinate and exchange technical expertise on materials.
 Provide technical guidance to develop new specifications and update existing specifications.
 Provide technical assistance and coordination with other discipline engineers.
 Participate in technical analysis during vendor prequalification, bid evaluation, and performance evaluation.
 Familiar with Pipe Jacking / Micro Tunnelling project (STEP / Link Sewer 54 KM Tunnel Abu Dhabi). Professional History
15.11.2015---to date
Al-Salaam Consulting Architects & Planners-----------►Senior Material / QC Manager
2012------------2015
Parsons International Limited---------------------------►Project QA/QC Manager.
2009------------2012
KN International Architects & Engineers L.L.C ---►Corporate Quality Manager.
1999 -----------2009
Hyder Consulting Middle East Ltd., Abu Dhabi----►ARE--Materials & Civil works.
1996------------1999
Cansult Limited International Consultant -----------►Material Engineer.
1994 –---------1996
Parsons International Ltd, Abu Dhabi-----------------►QA/QC Engineer.
1986 –---------1994
Command of Military works Abu Dhabi---------------►Material Engineer, ARE-Road
Al-Salaam Consulting Architects & Planners
Page 2 of 4
Projects summary 01.11.2015 to date Al Salaam Consulting Architects & Planners as Senior Material Manager in Core Committee (Client Presidential Guard Command projects). Responsibilities:  Review and evaluate Material Submittals for approval purposes.  Ensuring inspection of material received at site after by site based ASC staff receiving information /Matrix.  Review of soil reports for feedback purposes.  Analyse product failure data, Lab test results in order to verify tests on raw materials & finished products.  Design and ensure the testing & Quality control for Asphalt, soil and other Materials.  Monitor material performance and evaluate material prior to application.  Plan & implement Method statement Material application material compliance with relevant specifications.  Review new product plans and make recommendations for material selection based on design objectives.  Guide to technical staff and site staff engaged in application / installation materials.  Review and approve Plan for specific uses of repairs in concrete structures.  Mock up demonstration verified in order to ensure the proper application.  Factory visits for appraisals (Factory acceptance tests). 31.07. 2012 to 15.08.2015 Parsons International Limited— Consultant QC Resident Engineer Project: STEP Strategic Tunnel Enhancement Programme Link Sewer Contract LS-01 & LS-02 (Client ADSSC / Zublian). Responsibilities:
 Development and overall management of the CQP, and act to implement on all Quality control matters.
 Implement all quality control, inspection and testing requirements contained in the contract Documents.
 Certifying that all submittals status verify in order to comply with the Contract specification / document.
 Issue Non-conformance Report (NCR) for works or materials / equipment found not in Compliance with the contract requirements.
 Verify the submission of QC certification and documentation required in the contract.
 Overseeing performance of testing Laboratories, Factories and supplier.
 Verify that testing procedure comply with Contract Document, that testing facilities and testing equipment’s are available and complies with standard approved by ADSSC.
 Review and approve Inspection & Testing Plans (ITP), Method statement and Material submittals.
 Conduct surveillance visits to premises of nominated subcontractors/ suppliers for inspection of materials prior to delivery to site.
 Submit daily, weekly & monthly QC reports / records of QC operation & tests performed.
 Study corrective action and coordinated with contractor in connection to closure of issued NCRs.
 Review & Evaluate handing over completion reports. 01.08.2009 to 23.07.2012 KN KLUMPP PARTNERS—Consulting Engineers & International Engineers Abu Dhabi Corporate Quality Manager for Infrastructure, Building & ADSSC Sewerage projects. Responsibilities:
 Handling Projects-ADSSC over View, Reed Beds, Commercial Building, Villas, Jetty, Bridge and Roads.
 Appropriate monitoring/coordination services, planning and implementation, development, Execution, responsible for approval deemed necessary for job success.
 Comprehensive infrastructure / management policies initiation, approval of corrective actions, including regulatory agencies representatives, decisions making, changes incorporation at necessary occasions.
 QA / QC corporate liaison work with one or more project team or steering committee, senior managers and other key influences, possession and maintenance of outgoing and incoming policy and operation manuals.
 Also include services related to project and process control system etc.
 Review, Evaluate and approve all incoming Material Submittals on relevant Forms.
 Prepare Quality & Safety Manuals & Vendor evaluations as from Rev “0” Levels to follow-on.
 Coordination meeting with clients and KN design section on all material Issues.
 Technical evaluation of tender documents of Bidders.
 Preparation and review of contract specification and project Quality Plan.
 Act as Internal & External Auditor for different Department of Head Office and local base factories, Laboratories and on-going sites.
 Responsible for Material Submittals, Method statements approval.
 Responsible for drafting of Technical letters in regards to proposals, Submittals etc.
 Responsible to train the people as per ISO requirement.
 Technical Home support provide for ADSSC over view project like Sir Baniyas Reed Beds, Emirati Housing Sila, Reem Island, Sadiyat Island etc.
 To establish and activate Project Quality Plan and procedures with Project staff.
 Preparation of inspection and test plans and check lists for site activities.
 Deal all corporates / regional Quality issues with clients, bidders and stake holders of different contracts.
Al-Salaam Consulting Architects & Planners
Page 3 of 4
23-10-1999 to 06-08-2009: M/s Hyder Consulting Middle East Ltd. Abu Dhabi, UAE Assistant Resident Engineer Materials for Sewerage projects, Trunk lines, Pumping Stations, Bridge, Reem Island, Solid waste treatment plant project Mafraq Abu Dhabi Responsibilities:
 Handling Infrastructure, Road and Bridge (Reem Island) Projects.
 Materials, Method statement & ITP review and approved according to incoming submittals.
 Witnessed soil, concrete and aggregate testing including all Raw Materials for concrete.
 Conduct Factory Auditing reports for approval purposes (Factory acceptance test).
 Monitoring inspector’s activities on daily basis.
 Regular Factory Inspection of GRP,Pvc-u, HDPE, GRP Liners, RC Pipes, Epoxy Coating Applicators.
 Factories for Inspection Release+QC tests witnessing prior to products Release.
 Auditing of Factories i.e.GRP UPvc,HDPE,Ready Mix Plants , Independent Labs for appraisal purpose.
 Verified Online production QC of GRP, HDPE, uPvc, RC Pipes, GRP Liners and epoxy applicators.
 Co-Ordination meetings with Contractors and material Suppliers on different Quality Issues.
 Compiling of Monthly Material Report for Client on monthly basis.
 Review and Evaluate Material Submittals on “A” Forms. 26-10-1996 to 22-10-1999: Cansult Limited International Consultant worked as Material Engineer-Tarif to Al-Sila HI-Way Roads upgrading / widening project Responsibilities:
 Performs functions associated with the acquisition, manufacture, testing of application materials, delivery, storage, application, custody and verified Asphalt hot mix application.
 Have full awareness of testing requirements in compliance with relevant standards.
 Check material submissions and properly process approvals.
 To verify all existing utilities protection and re-location as per permit of work.
 Visit factories to ensure proper manufacture and testing of materials produced.
 Ensure materials delivered are as approved and are properly stored.
 Monitoring of Sub-grade & Sub-base laying, including Asphalt hot mix operation.
 Keep up-to-date with new appropriate materials.
 Monitor junior staff and site Laboratory control to ensure the proper testing.
 Attend progress and Quality meetings with clients. 02-11-1994 to 25-10-1996 Parsons Engineering Science Abu Dhabi as QC Engineer at Sewerage Treatment Plant Mafraq Phase II Contract 512, Sewerage Trunk lines Pumping Stations & Irrigation Projects. Responsibilities:  As QA /QC Lead, ensure compliance in meeting project requirements for Quality control system.  Assist with the development & implementation of specified QC/QC procedure and policies.  Oversight responsibilities for Site Quality staff provide back up support to Quality Associates as necessary.  Actively contribute to QA departmental internal / external audits.  To perform a technical review and make ensure on all quality system documentation.  To deliver training on good documentation practice as part of the modular project training programed.  To provide QA/QC assistance to all personnel at all levels at site as appropriate.  Carry out other reasonable tasks as required by the Line Manger.  Monitoring of incoming materials including storage, handling and Installations.  Witnessed all GRP, PVC-u and RC pipes testing at Factories i.e., RAK Plastic,ADFF,ADPF,FPI,TCTI.  Testing & Commissioning of SST, PST, SSD, PSD, EST, Aeration Tank and Head Works. 15-08-1986 to 01-10-1994: Directorate of Military works construction of Al Dhafra Air Base Phase II Abu Dhabi as Material Engineer, Lab in charge & ARE Roads. Responsibilities:
 Monitor Sub-Grade, Sub-base, Road-base & Asphalt laying at site & appraisal of Asphalt & Concrete Plant.  Ensure all materials meet to the contract specifications & Standards. BS, ASTM / AASHTO.
 Supervision of fresh concrete testing and pouring operation for heavy structure.
 Coordinate with the sites staff and Senior Road Engineer on daily basis for quality
 Review and Evaluate Material Submittals in order to final approvals for on-going activities.  Monitor daily construction activities and materials delivered to the site.
 Conducted all type of Asphalt Pavement, Lab testing, Road marking and Asphalt plant trial.
 Supervision of asphalt laying, instructing for site safety, earth work ,Sub –Grade & Sub -Base,
 All indoor & outdoor tests carry out for their compliance with project specification relevant standard.
 Laboratory Management, verify all test results, Equipment calibrations & Monitoring daily test schedules.
 Monitor Road marking, installing of street poles and Road studs at Taxi /Runway.
 Review of concrete mix design & conduct batching plant inspection on daily basis.
Al-Salaam Consulting Architects & Planners
Page 4 of 4
Work Shop / Seminars attended S.No Workshop / Seminar Attending subjects Seminar Organizer
1.1
Green Building technology and Materials
Dubai Central Lab
1.2
Leeds awareness sustainability.
Society of Engineering – UAE
1.3
Concrete & Steel Analysis and Design
Society of Engineering – UAE
1.4
Fire Building Codes—Abu Dhabi & International
Society of Engineering – UAE
1.5
Strategic Enhancement Tunnel Project—For Sewerage.
M/s Zublin
1.6
Road Marking
Prismo Road Marking Company.
1.7
The Role of Paints & Coatings in Sustainability
Wacker – Dubai
1.8
Estadama Compliance of Envelope Thermal Performance (Estadama)
Society of Engineering – UAE
1.9 Abu Dhabi Environment / HSE Management System Regulatory Framework (AD EHSMS RF)
Abu Dhabi Municipality – UAE
2.0
Introduction to Abu Dhabi International Building Code Programme
Society of Engineering – UAE
2.1
Reinforcing Steel – Assuring Quality & enabling greener supply chains
Society of Engineering – UAE
2.2
ISO 27001 & Risk Management (Security Awareness – Protecting our Valuable Assets)
Society of Engineering – UAE
2.3
Landfill Design and Management Programme
Society of Engineering – UAE
2.4
Concrete Technology by using Elcam Micro Silica
Society of Engineering – UAE
2.5
Ready –mixed concrete site practice course in Dubai in 2002
Concrete Society London.
2.6
Self-compacted concrete & Ready Mix site practice
M/s Unibeton Ready Mix
2.7
Fresh Concrete inspection and placement
Hyder Consulting
2.8
Glass Reinforced Plastic Pipes-Laying practice.
Hyder Consulting
2.9
The Middle East Conference on sustainable Building Materials in Dubai
M/s MADMA—Burj el-Khalifa
2.9.1
GRP Conference of Middle East & Asia
Abu Dhabi Municipality Summary of Auditee / Vendor supplier & Manufacturing Factories. S.No Auditee Name Audit Scope
1.1
M/s Fugro—M/s Exova—M/s MATRIX –M/s Geo Science and Material Lab for Material Testing Laboratory Services
To access the testing facilities
1.2
Encardio-Rite-Instrumentation & Monitoring execution.
To access the operation standard.
1.3
Commodore Cement Industries Factory-Pre cast units
To access the Quality standard
1.4
Al-Mereikhi precast–Gulf precast—Exceed precast—Union precast - Abu Dhabi Precast.
To access the Quality standard
1.5
Sharjah & Binary Cement Factory
To access the testing facilities
1.6
BASF-FOSROC—MAPEI—Sodamco of Technical Material products.
To access the operation standard.
1.7
Abu Dhabi Pipe Factory & Future Pipes of GRP Pipes producing Factory
To access the Quality standard
1.8
Delma Fiberglass -GRP Manhole Liner Manufacturing Factory.
To access the Quality standard
1.9
Sehara Emirate JAFZ---HDPE Fitting fabrication and supplier
To access the testing facilities
2.0
Cosmoplast-HDPE and uPvc pipe Manufacturing Factory.
To access the operation standard.
2.1
M/s Ducast for Manhole Cover & Frames manufacturing Factory.
To access the Quality standard
2.2
BRC--Steel & CICON Steel Fabrication Cut & Bend Factory
To access the Quality standard
2.3
Bin Lehaj Crusher --Quarry Crusher--RAK
To access the Quality standard
2.4
Western Bainonah-- Quarry Crusher--RAK
To access the Quality standard
2.5
Al-Futtaim-- Quarry Crusher—Shoka and Al-Ain
To access the Quality standard
2.6
UNIBETON-CEMIX & Quick Mix—Concrete Ready Mix Mussafah
To access the Quality standard
2.7
DEMAC-Overhead Crane
To access the Quality standard
2.8
Mahmut Steel and Kirby Structural steel Manufacturing.
To access the Quality standard References Name position Company Tel / email Relation ship
Sean. Jenner
Corporate Quality Manager
ED Zublin
0552618107
Ex-Immediate Boss
Hero Infante
Senior Infrastructure Manager
KN-International Engineers
0506754197
Ex- colleague
Ehab Abdul Azeem
Chief Resident Engineer
Hyder /Arcadis Consuling
0508137229
Ex-Immediate Boss
Osama Samy
Chief Resident Engineer
Dorsch Consulting
0506617962
Ex-Immediate Boss
Samer Diar Bakerly
Senior Project Manager
Parsons International
0506667431
Ex-Line Manager

Last Resume Update May 15, 2019
Address Abu Dhabi, United Arab Emirates
E-mail [email protected]
Phone Number 0507327690

Experience

Al-Salaam Consulting Architects & Planners
Senior Material / QC Manager
Nov 2015 - Current

Review and evaluate Material Submittals for approval purposes.  Ensuring inspection of material received at site after by site based ASC staff receiving information /Matrix.  Review of soil reports for feedback purposes.  Analyse product failure data, Lab test results in order to verify tests on raw materials & finished products.  Design and ensure the testing & Quality control for Asphalt, soil and other Materials.  Monitor material performance and evaluate material prior to application.  Plan & implement Method statement Material application material compliance with relevant specifications.  Review new product plans and make recommendations for material selection based on design objectives.  Guide to technical staff and site staff engaged in application / installation materials.  Review and approve Plan for specific uses of repairs in concrete structures.  Mock up demonstration verified in order to ensure the proper application.  Factory visits for appraisals (Factory acceptance tests).

Education

University of Punjab, Pakistan
Engineering Geology
Jan 1980 - Mar 1983

Engineering Geology

Contact Candidate