MEP Project ManagerRespected Sir / Madam,
I am forwarding my candidature as a MEP PROJECT MANAGER in your extreme organization.
I am a Bachelor of Engineering Graduate in Electrical and Electronics, with Holding 19+ years of total experience in the construction -Engineering field of holding 12+ years of hands of managerial experience in various MEP Projects of industrial, commercial & construction, residential operation & maintenance.
Working as a MEP Projects Manager M/s Al Zarooni Electromechanical L.L.C, DIP, Dubai, UAE
Worked as a MEP Project Manager of M/s Condor Building Contracting L.L.C, Dubai, UAE
Worked as a MEP Project Manager of M/s Sobha Engineering & Contracting L.L.C, Dubai, UAE.
Worked as a MEP-Project Manager of Guangsha Middle East Construction L.L.C at the project of car park and common utility tunnel of Al Maydan Dubai, UAE.
Worked as a MEP- Project Manager of Powertech Electrical Trading & Contracting L.L.C, RAK,UAE, at the site of Rebar and Rod Rolling Mill, Industries, , under United Steel International Industries, FZE. Fujairah. UAE.
Experienced in total operation and maintenance of 750mVA Electrical Distribution Plant including 65 Nos of Substation, emergency generators with 2 Nos of 25 MVA Gas turbines and other accessories of Al-Imam Islamic University, Riyadh with M/s Saudi Building Technic Maintenance Co, Riyadh, KSA.
Experienced in designing and installation of Electrical, Water supply, Drainage, Fire Alarm Fire fighting, Data -Voice Network, Air conditioning system, Compressed Air line system, as per DEWA, SEWA,& FEWA and other Authorities like Civil Defence standards.
Apart from this I have an experience in Interior Design including Electro-mechanical Designing, Installation, Commissioning of project like Hospitals, Education Institutions, Software Offices and industry, multi-storied buildings etc..
Personal skills are including capable to work under pressure of construction Field, work effectively in a multicultural environment, Flexible & Hardworking Personal.
I am a valid UAE, & Indian Driving licence holder also.
My contact mobile number is +971552308718.
I here with attaching my detailed resume for your kind perusal & awaiting for your valuable reply. Thanking you & yours faithfully,
SAJEEV.C.K.
Last Resume Update | March 8, 2019 |
Address | dubai, United Arab Emirates |
sajeevckdubai@gmail.com | |
Phone Number | 00971552308718 |
Experience
PROJECTS MANAGER
1. B+GF+5Typ Floor+ Gym & Sym Pool Residential Building at DIP,
Belongs to ARANCO, DUBAI .
Snap Shot: Final testing commissioning of all Electro-mechanical equipment’s including all the specialized subcontractors items, Authority final inspection, complies and acceptance. Final closing out of the project including subcontractors, material and documentation as a part of the project handover as per the contract..
2. B+ GF+MF+ FF office and Commercial Building at Al safa-1, Firdos-4 belongs to DREC ,Dubai, UAE.
Snap Shot: Involved in the most challenging stage of the project life cycle design and change form assigned contract of Residential building to office and commercial building at Al Safa, Dubai, UAE.
3. Electromechanical Works for Micro Synergy - Pharmaceutical Factory, Jaffa, Dubai , UAE.
Snap Shot: Involved in the most challenging stage of the project life cycle including the Site Execution with in the allowed budget, Authority final inspection, complies and acceptance. Final closing out of the project including subcontractors, material and documentation as a part of the project handover as per the signed contract.
4. Electromechanical Works for Container Terminal T3 Extension- Jabal Ali Port, Dubai, UAE.
Snap Shot: Involved in the most challenging stage of the project life cycle including design finalizing the venders, authority coordination for design approval complies and acceptance, site execution with in the allowed budget, including all necessary documentation as per the signed project schedule.
MEP PROJECT MANAGER
1. 164 Villa Project, DBT One Residential Projects. L.L.C,
TECOM, Al Barsha South, Dubai.
Snap Shot: Electro-mechanical part of 164nos of Luxury Villas construction in a short duration of project life cycle, which is one of challenge in the time frame of project execution and stake holder’s coordination including the testing and commissioning part of the project & phase vise handover as per end user satisfaction.
2. Extension of Accident and Trauma Center, Rashid Hospital. Umm Al Hurair, Dubai.
Snap Shot: Most challenging job in the project life cycle for the building extension of additional two floors including 63nos ICU’s and 77nos patient rooms for fully functional trauma center @ Rashid hospital of all advanced medical and electromechanical, ELV and Medical systems including Integration with existing hospital in a short duration of time.
3. 2B+G+3P+18 Floor Fairview Residency @ Business bay, Dubai.
Snap Shot: Electro-mechanical part of the residential cum commercial building project belongs to M/s Dayaar Properties, challenge in the successful completion of the project including testing and commissioning part of the systems and change request implementation as per the authority regulation update.
4. B+G+4 Floor Residential Building, condor Castle @Jumairah Village, Dubai.
Snap Shot: Electro-mechanical part of 87 residential apartment building, belongs to M/s. Condor Properties, challenges the execution part of the project and change request implementation as per the enterprise environmental factors. .
5. 2B+G+6 &3 Floor Makateb Office Building @ IMPZ, Dubai.
Snap Shot: Electro-mechanical part of 2 Nos Of G+6 and G+3 Floor with Common 2 basement floor each building , belongs to M/s TECOM challenges the execution and testing commissioning part including change request implementation as per the authority regulation update.
6. ADNOC Filling Station,@ Dhaid, Sharjah.
Snap Shot: Electro-mechanical part of new petroleum product filling station with 6 Nos of filling points including its safety system for the constructed Filling station belongs to /s. ADNOC challenges are the execution part in the constrained allocated area in a short project life cycle.
7. Du Samacom, Data Center @ Al Qudra, Dubai.
Snap Shot: MEP Part including the satellite communication infrastructure networking system of centralized data center belongs to M/s. Du challenges in the execution part including change request implementation in the testing commissioning level.
MEP PROJECT MANAGER.
1.MEP Coordinator- Meydan Heights Villas, Dubai, UAE
Snap Shot: Electro-mechanical part of 333nos of precast villa construction belongs to M/s Meydan @ Nada Al Shaba, Dubai. Challenges for the close coordination in design and execution conversion of precast type villa from normal cast in site type villa.
2.PROJECT Manager –Additional MEP and Lift works at Operation Center Dubai Silicon Oasis, Dubai, UAE
Snap Shot: Electro-mechanical part of additional building construction including additional Installation works belongs to M/s Silicon Oasis of the challenge of all the system integration with existing as per the project scope requirement.