Certified Bachelor of Mechatronics Engineer (Mechanical Engineer) with 2 years of International experience and proven track record in delivering projects in UAE.Diverse experience acquired through occupying key positions in HVAC system design and Pipe line firms. In depth knowledge and solid experience in fields like site technical support, site supervision works,construction of pipelines,multidisciplinary engineering coordination of MEP works and mega projects, including duct insulation and piping firms in the industrial project like HVDC BorWin3 which is a high voltage direct current (HVDC) link under construction to transmit Offshore wind power to the power grid of the German mainland. Extensive involvement in all project reports starting from FEED and proposal stage and up to construction and project closing stage.

Last Resume Update April 27, 2019
Address dubai, United Arab Emirates
E-mail v.nit.joe59@gmail.com
Phone Number +971556132437

Experience

Challmers Marine Engineering
Hvac Site Engineer
Aug 2017 - Oct 2018

• Dealt with stainless steel, Carbon steel fitups and prepare the WPS and makes arrangement for the fitup inspection to the client and gets approval from them.
• Handled Ducting and pipe leak test.
• In charge of all levels in Dry Docks HVDC BorWin3 which is a high voltage direct current (HVDC) link under construction to transmit Offshore wind power to the power grid of the German mainland.
• Expertise in handling all the duct installation (both spiral ducts and rectangular ducts).
• Handled bulk head insulation, deck head insulation, duct insulation and pipe insulation.
• Expertise in handling ABO, HBO and thermal insulation and also piping for freshwater & chilled water line.
• Allocate the works for the staffs, raises RFI and internal QA and finally submit it to the client
• Coordination with consultant, client, main contractor &sub contractors, Arranging & forecasting of manpower, material, tools & machineries as per project requirement.
• Check Electrical, HVAC, Plumbing and Fire Fighting works concept reports and designs and drawings received from consultants.
• Strictly follow up & chase the site staff to complete the project as per target program from the Project Manager
• Prepare work schedules and carrying out resources planning and resource balancing.
• Responsible for smooth running of projects, track & control on material labor output.
• Review and Approval of Material Submittals for MEP Works.
• Field Supervision and Site Coordination for all MEP Works.
• Attend Weekly Coordination Meeting with the Client, Project Management Consultants and Sub Contractors.
• Issuance of Punch list items and site verifications/closure.
• Prepare Testing and Inspection Procedures for MEP Works.

Larsen and Turbo
Mep design
Jun 2016 - Aug 2017

• Coordination with consultant, client, main contractor &sub contractors, Arranging & forecasting of manpower, material, tools & machineries as per project requirement.
• Check Electrical, HVAC, Plumbing and Fire Fighting works concept reports and designs and drawings received from consultants.
• Supervise the Design Team in the development and preparations of MEP design.
• Report any eventual problems for rectification and integration in the design.
• Provide Technical Support to resolve potential conflicts arising on Site in coordination with the Sub System, Operation Project Control (OPC) and The Sub Contractor.
• Interface Coordination of all Sub System Requirements and Consolidate into the SYSTEM Design.
• Coordinate and lease with Civil Contractor of all SYSTEM Requirements

Education

Bannari Amman Institute Technology
Mechatronics Engineer
Jun 2013 - Mar 2017

Passed with a percentage of 71 %