
Irmina de Guzman
Engr w/ 26 Yrs Experienced w/c includ 16 Yrs in UAE Handling QMS of Projs as a QA/QC Focal PointMy Contractor Experienced:
I have worked with the Contractor from 2003 to 2014 for the following projects as QAQC Focal Point/Project Focal Point:
-Al Ain Hospital Project (Main Works Package) Construction of Dhs 4.309 billion new Al Ain Hospital,
-Al Ghafli Precast Manufacturing Abu Dhabi and Al Ain,
-KIB Development 282 Flats Project Burdubai Dubai
-Al Ghafli Wood and Metal Industries Abu Dhabi
-Al Ghafli General Contracting Dubai Branch and Abu Dhabi Head Office
-Remraam Housing Project Dubailand Dubai
-Sas Al Nakhil 267 Villas Project Abu Dhabi
-Palm Jumeirah-Shoreline Apartment (456 Standard Apartments, 16 Modern Penthouse, Corridors and Lift Lobby) Jumeirah Dubai
-Palm Jumeirah Villas (1,384 Villas of Type Canal Cove, Signature and Garden Homes located at e, d, k, p, o, b, a, m, l, f, c Fronds) Jumeirah Dubai
-Royal Airwing-Airport AX152 Project Dubai
-Conference Palace Hotel (Emirates Palace Hotel) Project Abu Dhabi
My Client Experienced:
I have worked with Musanada as QAQC Engineer for 2 years last Oct 2014 to Aug 2016 and I handled 11 schools for ADFS Phase 5.
My Consultant Experienced:
Currently I am working with Al Suweid since Aug 2016 and my major tasks are as follows:
QAQC Engineer for:
-ADFS Phase 6 Package 5 at MBZ Abu Dhabi (Al Danah School) – From Aug 2016 up to Feb 2018.
-ADFS Phase 6 Package 13 at Al Falah Abu Dhabi (Al Rayana School) – From Aug 2016 up to Apr 2019.
-ADFS Phase 6 Package 1 at Al Shakhbout Abu Dhabi (Al Meleih School) – First 6 months only.
Project Closeout Engineer for:
-ADFS Phase 6 Package 5 at MBZ Abu Dhabi (Al Danah School) – Up to Apr 2019.
-ADFS Phase 6 Package 13 at Al Falah Abu Dhabi (Al Rayana School) – Up to Apr 2019.
DLP Engineer (Defects Liability Period)/Consultant Representative for:
-ADFS Phase 6 Package 5 at MBZ Abu Dhabi (Al Danah School) – Up to Apr 2019.
-ADFS Phase 6 Package 6 at Al Waha Al Ain (Al Sheikha Bint Suroor School) – Up to Apr 2019.
-ADFS Phase 6 Package 7 at A Shuaibah Al Ain (Al Al Janain School) – Up to Apr 2019.
-ADFS Phase 6 Package 8 at Al Quaa Al Ain (Al Al Saadah School) – Up to Apr 2019.
-ADFS Phase 6 Package 10 at Al Ain Al Faidha (Al Narjes School) – Up to Apr 2019.
Also please find below my additional tasks:
-I am assisting the Resident Engineer at site for everyday work.
-I am assisting the Musanada PM during BCM Internal Audit and Third Party Audit.
-I am conducting the Internal Audit for the Contractor.
-I am conducting Second Party Audit/Internal Quality Audit for other Portfolio of Al Suweidi: like Housing and Infrastructure.
Last Resume Update | May 7, 2019 |
Address | Abu Dhabi, United Arab Emirates |
[email protected] | |
Phone Number | +971502504018 |