jenno lacao-cao
Engineer / technicianPROFESSIONAL COMPETENCIES
Knowledge in installation of AC/DC power supply and other ELV system equipment.
Knowledge and good experience in the material follow, cable laying and termination.
Review the block diagrams, Panel/cabinet layout and Wiring drawing, termination drawings, interconnection Diagrams, Equipment layouts, routing layouts of the Telephone System, Lan/Wan, Structured cabling system.
Knowledge in certain application of Huawei apparatus and applications.
Knowledge in basic troubleshooting for Microsoft software and hardware. Knowledge in commissioning, integration, testing and troubleshooting certain telecommunication apparatus such as Huawei and Philippines Long Distance Telephone (PLDT) Company.
Knowledge and experience in telecommunications.
Knowledge in Computer operation software such as: AutoCAD, MS Office, Putty, SecureCRT, Teraterm.
Utilizing a range of office software including E-mail, Spreadsheet and Database.
Knowledge in Process Instrumentation and Control.
Knowledge in Calibration such as Temperature Transmitter (TT and RTD), Pressure Transmitter (PT) and Different Pressure Transmitter (DPT).
Knowledge in Controller Configuration (Micro-controller PID configuration).
Knowledge of using HART 375 communicator, Fluke 87 calibrator, Uni-T UT201 digital clamp multi-meter.
ACADEMIC QUALIFICATIONS
Bachelor of Science in Electronics and Communication Engineering AMA Computer College Sta. Cruz Laguna, Philippines S.Y (2011 - 2016)
Instrumentation & Control Servicing Electro Technical Institute (TESDA) Technical Education and Skills Development Authority (NCII) National Certificate Level. II Certificate no. 17043402021821 Cabuyao Laguna, Philippines (Aug-Oct 2017)
CAREER HISTORY
SITE ENGINEER PHILKO UBINS LTD. CORP
(April 23 2018 - Jan 5 2019)
A sub-contractor of Huawei Technologies Co., Ltd. that was in-charge of rehabilitating/Migrating the fiber to the buildings (FTTB) and fiber to the cabinets (FTTC) of Philippines Long Distance Telephone (PLDT) company to provide high-capacity of equipment OLT platforms for flexible optical networking.
Generate Technical Site Survey Report (TSSR)
Perform Validation and Missing lines reports
Perform Commissioning, Integration and Testing’s (CIT) of new Huawei Multi- Service Access Node (MSAN).
Fiber Optic Cable (FOC) transmits and receives quality checking.
Dismantling / installation from old node/equipment to new node/equipment.
RECTIFIER
HUAWEI MSAN NODE
ALARM BOX
Troubleshooting fault tickets associated with voice & data quality and other faults. Perform Subs-Cable Termination
Perform Alarm simulations.
AC FAILURE ALARM
RECTIFIER FAILURE ALARM
LOW BATTERY ALARM
HEAT SENSOR ALARM
DOOR ALARM
BATTERY THEFT ALARM
RESPONSIBILITIES:
Ensuring all rehabilitating/Migrating sites will be resume within a short downtime of service.
Ensuring all rehabilitating/Migrating sites will be resume all customer data and service connections.
Ensuring all rehabilitating/Migrating sites will pass in the QC and QA requirements
Last Resume Update | April 27, 2019 |
Address | Abu dhabi, United Arab Emirates |
jennolacaocao@gmail.com | |
Phone Number | +971501601334 |