fahad mohammad

HVAC SITE ENGINEER

An Experienced Hvac Site Engineer over 5 years of field experience

I am enthusiastic, hardworking and have excellent communication skills.

These qualities have enabled me to build and maintain excellent relationship with clients and my fellow workers in my previous roles.

 

I would enjoy the chance to put these skills to work within your company to ensure that it enjoyed continued success in the future.

It is my inner confidence built due to the knowledge I have perceived through all these years of learning, which will help me to excel in the field. I am capable of adjusting myself to any environment.

As a Mechanical Engineer, I have overall responsibility for estimation jobs, under my control, reporting directly to the Project Manager and/or Construction Manager.

High expertise in all types of Heating Ventilation and Air-conditioning systems
 Quantity Take off of Ducting, Piping, Insulation, & All Valves
 Assigning works to Business Associates for Carrying out ducting, piping, insulation, pump room installation, electrical & fabrication works as per approved layouts & specification
 Managing a team of Site supervisors and giving guidance in technical aspects to achieve target on time without compromising the quality while executing the projects
 Coordinating with Sales Team, Planning Team and Materials Team in executing the project as per schedule
 Preparation of Construction Program, reviewing the project progress daily/ weekly, attending the project meetings to meet customer requirements & achieving for on time completion
 Coordinating with various trades to expedite works and to avoid repetitive works
 Corresponding with the Customers & Consultants at various stages from project execution to handing over
 Preparation of handing over document with the following details
 Material inward check list
 Equipment Installation check list
 Quality check list – each stage of the completion of the work
 Commissioning report signed by the consultant and facility team
 Snags list signed by the consultant and facility team
 Equipment & valve list
 Photographs of the installed equipment
 Completion certificate signed by consultant and facility team

Last Resume Update March 9, 2019
Address dubai, United Arab Emirates
E-mail fahadme30@gmail.com
Phone Number +971-563218474

Experience

NATIONAL AIRCON
PROJECT ENGINEER HVAC
Apr 2018 - Jan 2019

• Responsible for taking care of SITE/QC work for all HVAC Systems
• Quantity Take off of Ducting, Piping, Insulation, & All Valves from Auto-cad.
• Assigning works to Sub Contractors for Carrying out ducting, piping, insulation, pump room installation, fabrication works as per approved layouts & specification.
• Managing a team of Site supervisors and giving guidance in technical aspects to achieve target on time without compromising the quality while executing the projects.
• Supervising Fire Fighting / Plumbing / Drain system
• Generally responsible for implementations and monitoring of all HVAC systems such as Air cooled system VRV systems, DX systems.
• Ordering the material as per project specification and requirement.
• Attend/Arrange Minutes of Meeting with Contractors and Suppliers.
• Over-viewing Submittals, Shop drawing, As Built.
• Installation of AHU’S, FAHU, Packaged Units, DX units in all commercial Buildings and domestic villas.
• Preparation of documents for Inspection Request and Material Inspection Request.
• Maintaining the logs for IR, MIR and Shop Drawings.
• Involvement in measurement of work progress.
• Coordinate with Site Engineer, Draftsman, Supervisor, and Foreman HVAC sub contractors for site related issues.
• Responsible for Pre Commissioning, Testing & Commissioning.
• Responsible for closing all snag issues at site.
• Handing over of Operation and Maintenance manual
• Preparing Hand over documents

AIRTECH ENGINEERING
MECHANICAL ENGINEER
Jan 2015 - Jul 2017

• Responsible for taking care of SITE/QC work for all HVAC Systems
• Quantity Take off of Ducting, Piping, Insulation, & All Valves from Auto-cad.
• Assigning works to Sub Contractors for Carrying out ducting, piping, insulation, pump room installation, fabrication works as per approved layouts & specification.
• Managing a team of Site supervisors and giving guidance in technical aspects to achieve target on time without compromising the quality while executing the projects.
• Supervising Fire Fighting / Plumbing / Drain system
• Generally responsible for implementations and monitoring of all HVAC systems such as Air cooled system VRV systems, DX systems.
• Ordering the material as per project specification and requirement.
• Attend/Arrange Minutes of Meeting with Contractors and Suppliers.
• Over-viewing Submittals, Shop drawing, As Built.
• Installation of AHU’S, FAHU, Packaged Units, DX units in all commercial Buildings and domestic villas.
• Preparation of documents for Inspection Request and Material Inspection Request.
• Maintaining the logs for IR, MIR and Shop Drawings.
• Involvement in measurement of work progress.
• Coordinate with Site Engineer, Draftsman, Supervisor, and Foreman HVAC sub contractors for site related issues.
• Responsible for Pre Commissioning, Testing & Commissioning.
• Responsible for closing all snag issues at site.
• Handing over of Operation and Maintenance manual
• Preparing Hand over documents

GLOBAL AIRCON
HVAC SITE ENGINEER
Jun 2012 - Sep 2014

High expertise in all types of Heating Ventilation and Air-conditioning systems
 Quantity Take off of Ducting, Piping, Insulation, & All Valves
 Assigning works to Business Associates for Carrying out ducting, piping, insulation, pump room installation, electrical & fabrication works as per approved layouts & specification
 Managing a team of Site supervisors and giving guidance in technical aspects to achieve target on time without compromising the quality while executing the projects
 Coordinating with Sales Team, Planning Team and Materials Team in executing the project as per schedule
 Preparation of Construction Program, reviewing the project progress daily/ weekly, attending the project meetings to meet customer requirements & achieving for on time completion
 Coordinating with various trades to expedite works and to avoid repetitive works
 Corresponding with the Customers & Consultants at various stages from project execution to handing over
 Preparation of handing over document with the following details
 Material inward check list
 Equipment Installation check list
 Quality check list – each stage of the completion of the work
 Commissioning report signed by the consultant and facility team
 Snags list signed by the consultant and facility team
 Equipment & valve list
 Photographs of the installed equipment
 Completion certificate signed by consultant and facility team

Education

JNTUH
BTECH MECHANICAL
Sep 2008 - May 2012

Contact Candidate