- A Project Manager of Construction Projects, specializing in the areas of Project Management and Delivery of EPC contract works in process industries - Oil & Electrical Substation, MEP, Energy sector / Power Utility industry, with versatile and vast experience of total6+ yrs.
- A resourceful and adaptable professional with considerable knowledge of the construction industry and end-to-end project delivery encompassing Engineering, Procurement, Logistics, Construction, Pre- Commissioning / Testing and Commissioning support, Handover and Warranty Period suppor
- Possessing sound organizational, planning / scheduling and time management skills, as well as consistent track record of improving efficiency and optimizing
- A confident and reliable individual, with a proactive “never let go” attitude towards solving problems and efficiently multi-tasking to interface with all stakeholders - Clients, Consultants, Suppliers/Vendors/OEMs, Construction & Commissioning team Managing and coordinating project activities to ensure that all project deliverables are achieved with regards to safety, quality, programme and cost.
- A seasoned Project Management professional with a matured mind set to seamlessly handle professional relationships with all project stakeholders of diverse professional and cultural back groun
SKILLS
- Preparation of Project Execution Plan, focusing on the aspects of scheduling, budgeting, accounting, reporting, contract negotiation and administration, project execution, and stakeholder management. Identifying project and schedule risks and managing / mitigating them.
- Strategic leadership in the areas of Tendering, Engineering, Procurement, Logistics, Construction / Renovation / Facility Upgrade, Testing & Commissionin
- Evaluating scope of work and preparing project execution strategy based on high-level schedule.
- Providing insights to the Planning / Scheduling / Project Control Engineer to develop a realistic and detailed schedule.
- Ensuring strict adherence to contract clauses through project lifecycle and minimizing deviations.
- Coordinating with Procurement Dept. to ensure timely delivery of materials and equipment.
- Interfacing between construction and design teams to resolve engineering issues.
- Delivering reports - daily, weekly & monthly progress/s-curve analyses; look-ahead etc. - and presentations to the client.
- Conducting weekly and monthly progress review meetings, monthly HSE meetings and management.
- HSE walk-downs with the client.
- Overall P & L accountability, preparing internal budget, applying cost control measures & monitoring cost variances for the project.
- Billing / invoicing and following up payment to ensure positive cash-flow. Providing
- Developing project procedures and processe
- Participating in contract negotiation and preparation.
- Contract execution, planning, monitoring, and reportin
- Budget and expenditure con
- Subcontract administration.
- Project financing adminis
- Good understanding of multi-disciplinary engineering –Electrical, Mechanical, Piping, Instrumentation & Control Systems, Fire & Gas Systems e
- Good understanding of Asset Integrity and Process Safety issues, and Technical Authority processe
- Delivering projects maintaining robust HSE and quality standards, schedule, and cost analysis management / budget performance.
- Highly effective communication and presentation skills, both written and oral and project report writing skills.
- Ability to work in a multi-disciplinary, cross functional, multi-location team environmen
- Ability to manage and maintain customer relationships and portfolio of contrac
WORK HISTORY
CAPSA Engineering & Contracting LLC (Project Manager) (April-21 till date)
Project: Replacement of Existing Bus Bar Joints at Car Park in Sheikh Khalifa Energy Complex Tower-2 & 3.
Roles and Responsibilities
- Supply installation, Testing and commissioning of Bus bar joints assembly for 4000A twin bus way, 1600A, 1200A, 1000A and 800A spectra series, Copper , 3P4W, Internal Ground manufactured by GE of USA.
Project: ADNOC OLD HQ Electrical Power System Renovation work.
Roles and Responsibilities
- Removal of existing MSDB/SMDB/DB and Re- install with new one.
- Termination of existing outgoing circuits & cables.
- Replacement of existing Bus Bar Risers having a capacity of 1000A and 800A.
Project: Mechanical Maintenance Works at various ADNOC Distribution facilities across UAE
Roles and Responsibilities
- Supply, Installation & Commissioning of Carbon steel pipe spool (above / underground) with pipe Size from 1/2” to 24 ” Sch 40/80 with flange Cl 150/300.
- Supply, Installation & Commissioning of underground GRE / GRP pipe line of size 10” to Size 20”.
- Overhauling of 1 ½” till 3” Hydraulic actuated ball valve.
Project: Maintenance of Electrical transmission lines and Network at Ruwais Refinery.
Roles and Responsibilities
- Periodic maintenance of 132kV & 33kV OHL line and providing details of any tower repair job or any insulator replacement job to ADNOC refining.
- Installation and maintenance of entire Refinery plant which includes lights such as HID, fluorescent lamps, tube lights, LED and its circuit rectifications.
- Operation and Maintenance of substations of 33KV, 11KV and 440V and of 11KV RMUs.
Abu Dhabi National Oil Company (Electrical Maintenance Engineer) (Sep 18 April-21)
Deputed by:-Lattice General Contracting LLC, Abu Dhabi
Roles and Responsibilities
- Maintenance of Electrical transmission lines and Network at Ruwais Refinery.
- Periodic maintenance of 132kV & 33kV OHL line and providing details of any tower repair job or any insulator replacement job to ADNOC refining.
- Comply with relevant discipline OMS and client procedures in execution of work activities.
- Communicate with the Lead Maintenance Engineer if any improvement is required.
- Acting as Interface Engineer between ADNOC Project and ADNOC Maintenance ( RAS) for any new project.
- Co-ordinating with ADCO offshore electrical and ADNOC refining electrical for any shutdown activities in 33KV Jabal Dhana substation.
- Preparation of JSA for any shutdown activities or any new project such as installation of new Panel, Cable laying, confined space activities, Hot work etc.
- Performing electrical isolation of feeder’s up to 33KV as per LOTO.
- Coordinating between ADNOC refining and Ruwais Housing Complex (RHC) team for any 132KV /33KV OHL shutdown or replacement of surge Arrestor in both side gantry area.
- Preparation of BOQs, Red line mark-up drawing after completion of any new project.
- Coordinating with different vendors for any new material requirement and get an acceptable quotation.
- Participating in commissioning activities of any new project.
- Maintaining all the records and PM schedules via an Enterprise Asset Management software solution MAXIMO & SAP.
- Installation and maintenance of entire Refinery plant which includes lights such as HID, fluorescent lamps, tube lights, LED and its circuit rectifications.
- Installation and maintenance of Dali lighting operating system inside the main control building.
- Installation and preventive maintenance of 33/11KV, 11/5.5 kV and 5.5/0.440KV transformers.
- Operation & maintenance and Isolation of 11kV ring main substations (RMU).
Ministry of Electricity & Water (Operations Engineer) (Dec 17 till Sep-2018)
Deputed by:-Integral Services Company WLL, Kuwait
Operation of Jabriya District Control Center (JDCC) which has access to 158 substations of voltage level 132KV, 33KV and 11KV.
- To perform the switching operation carefully without any electrical loss in the network.
- To understand the electrical network and prepare the load flow of entire day for all substations.
- To co-ordinate with the National Control Centre in case of any trip or fault.
- To perform the switching operation in ring main side by co-ordinating with the different area engineers.
- To coordinate and pass the information to respective departments (Switchgear, Protection, Transformer, Cable, Battery, SF6 etc.) in case of any alarms or fault.
- To prepare the preventive maintenance programmes for each day and pass to all departments.
- To prepare the fault report in case of any trip and send to higher authorities.
- To prepare the log sheets of 132KV, 33KV and 11KV containing each day switching details.
- To prepare the Telemetry fault report, Daily change of CBs and Daily activity report for measure changes.
Kuwait Oil Company (KOC) (Electrical Technician) (Jan 16 till Dec 17)
Deputed by:-Gulf Spic General Trading & Contracting Company WLL (GS), Kuwait
Roles and Responsibilities
Gas Boosters Stations:
- Operation and Maintenance of KOC Gas boosters stations BS-170 & 171.
- Coordination with the client regarding day to day activities and planning for shutdown activities or any opportunity based job.
- Maintenance of switchboards up to 11KV of Al Ahleia Switchgear
- Perform routine inspection and maintenance of Siemens turbines.
- Handling the project activities in GC-27
- Maintenance and start up activity of Glycol and Regeneration unit.
- Planning of shutdown activity during shutdown of any train or gas boosters and HP/LP Turbine.
- Operation and Maintenance of Instrument Air Compressors and study its logic for PLANT/STAND-BY and INSTRUMENT AIR modes.
Cairn Energy India Ltd., Barmer (Rajasthan) (Electrical Engineer) (Oct 12 to Jan 16)
Deputed by:- Sach Electro Mech Pvt Ltd
Project: Installation, Erection, testing and commissioning of sub stations up to 33 KV and all types of electrical equipment.
Roles and Responsibilities
220KV Grid activities:
- Experience in Installation ,Erection, testing& Commissioning at Barmer up to 5 BAY in 220 KV Sub-Station under Cairn Energy India Pty Ltd.
- All equipment knowledge in 220/33KV switchyard like C.T, C.V.T, L.A, ISOLATOR, REACTOR & TRANSFORMER.
- All wiring testing in 220KV Switchyard according to drawing.
- Knowledge in isolator also (Mechanical and electrical alignment).
- Preparation termination schedule up to 220KV sub-station.
- Managing of a complete substation project including preparation of technical specification.
- Erection & Commissioning of Electrical Equipment like Power T/F, CT, PT, CB, Isolators, control & relay Panels, their support structures etc.
- Keeping liaison with contractors, vendors & client for smooth running of work.
- Handled preparation of BOQ of 220 KV as per technical specifications
Installation & Commissioning activities:
- Installation & Commissioning of WEG make Steam Turbine Generator Turbine Generator 12x4 MW and its Auxiliary drives.
- Commissioning of Thermax make Boiler 115x5 TPH and its Auxiliary.
- Installation of 33KV SWGR Board (ABB), 11KV SWGR Board (ABB) 6.6KV SWGR boards (ABB) and L&T make PMCCs and MCCs inside the substation and its control room.
- Installation and Commissioning of HT, LT power and distribution transformers up to 20/26 MVA.
- Installation of HT and LT motors ratings up to 4567 KW (Flame proof & Non Flame proof ) supplied by world class reputed vendor like ABB, Siemens, G.E. and CGL.
Operation and Maintenance:
- Perform routine maintenance inspection on equipment to respond and identify problems on breakdowns in timely manner.
- Operation & control of safe permit to work system with risk assessment.
- Provide solution and escalated equipment malfunctioning, system fault and network errors – using root – case – failure technique, corrective actions, modifications and the replacement and/or new installation.
- Routine checking of all equipment and recording of operational parameters.
- Report time – to – time abnormalities and failure and take corrective actions according to the inspection to the control room.
- Operation and maintenance of 33KV SWGR Board (ABB), 11KV SWGR Board (ABB) 6.6KV SWGR boards (ABB) and L&T make PMCCs and MCCs.
- Handling abnormal & Emergency Operation (Black-Out), Start up, Shut down & fault finding / Trouble shooting.
- Load sharing, shedding and synchronization as per process requirements.
- Carrying out Field Operation & conditioning monitoring of equipment like HT/LT Motors, Transformer, HV, MV and LV Distribution system.
- UPS, Battery, Battery charger, Diesel Generators, Fire Water Pump, RO plant and air compressor.
Cairn Energy India Ltd. (Electrical Engineer) (Oct 11 to 0ct 12)
Deputed by:-Kailash Traders
Project: Maintenance of Project
- Supervision of Electrical (HT and LT) and Instrumentation Cable laying on the well-pads of the Mangla as well as Bhagyam fields and also perform its glanding and termination into JBs and Control Rooms.
- Preparation of Cable Schedule as per the SLD(Single Line Diagram).
- Preparation of Meggar Test Reports as per the client’s requirement.
- Panel Installation check.
- Material Management (Preparation of Material Requisition Note, Reconciliation.)
- Preparation of data-sheets of various Electrical Equipments and cables and cable schedule.
- 33 KV EHT cable Meggering and performing the Hipot test and preparation of cable schedule and test reports.
- Supervision of 33KV EHT cable joint.
- Maintenance and Installation of Electrical Machines.
- Performing operation and maintenance of control system used in static and rotating (Compressors, Pumps, Blowers, AC drives) equipments automation and control.
- Measuring and maintaining daily throughput.
- Preparation of maintenance procedure , Instrument data sheets, cable schedule, and procurement orders etc.
Cairn Energy India Ltd. (Electrical Engineer) (Aug 10 to Oct 2011)
Deputed by:-Petro IT, Gurgaon
Project: Maintenance of substations up to 11KV
- Operation and maintenance of all electrical equipments of 11kV substations: transformers, LV & H.V switchgear, Battery, UPS, Isolation transformers, Lighting panel etc.
- Performing conditioning monitoring for panels and transformers.
- Performing periodic break down voltage test and silica gel inspection for transformers of 11/0.440KV.
- Performing maintenance of all types of L.V. and H.V switchgear of make L & T and Siemens
- Performing maintenance of L.T and H.T motors including its installations at sites..
- Prepare of Electrical completion, pre-commissioning & commissioning check lists.
- Marking the System and Sub- systems limits on Layout, SLD & Cable Schedule for Construction Completion and Pre-Commissioning phase as per the operational philosophy.
EDUCATION
- Tech. (ELECTRICAL): From IITT COLEGE OF ENGINEERING, KALA-AMB (Himachal Pradesh) in 2010.
- CBSE (XII): From MODI PUBLIC SCHOOL, Kota, Rajasthan in 2005.
- CBSE (X): From SRI SATHYA SAI VIDHYAPEETH , Sri Sailam, Kerala in 2003.
TRAININGS ATTENDED
- Permit to work system.
- Basic Fire training.
- Training regarding the SCBA (Self Contained Breathing Apparatus).
- IMIST (International Minimum Industry Safety Training).
- Basic knowledge of H2S (Hydrogen Sulphide) gas.
- Confined space
- Working at height
- Basic knowledge of Gas testing.
SOFTWARE PROFICIENCY
- Well versed with Aconex, SAP, MAXIMO and ERP softwares.
- Basic knowledge of Primavera P6.
- Well versed with the latest Microsoft Operating Systems.
- Expert in usage of MS Word, Excel, Power point etc.
PERSONAL DETAILS
Date of Birth: 05th May, 1987.
Languages: Hindi & English.
Passport No: M1196850
Mob : +971-501032490 & +91-9931317389
Email ID/Skype ID: ashutosh.iitt@gmail.com
Nationality: Indian
UAE Driving License: 2804286
LinkedIn profile: https://www.linkedin.com/in/ashutosh-kumar-77718051
Last Resume Update | March 4, 2023 |
Address | Abu Dhabi, United Arab Emirates |
ashutosh.iitt@gmail.com | |
Phone Number | 971501032490 |
Website | https://www.linkedin.com/in/ashutosh-kumar-77718051 |