ANIL KUMAR
QA/QC InspectorPROFILE SNAPSHOT
A dynamic and competent professional with over 23 years of rich experience in Construction and Inspection activities related to Electrical and Instrumentation.
- Adroit with the concept Visual, Close and Detail inspection on installation of intrinsically safe systems (Exi), Flame-proof (Exd), Increased safety (Exe) and associated accessories in potentially explosive hazardous atmosphere (IEC60079 – 14 & 17).
- Demonstrated abilities in performing material receiving inspection, handling storage, preservation and ensuring compliance to the requirements.
- Leveraged skills in reviewing & approving EPC Contractor’s inspection & test plan, work procedures and method statements
- Exceptional operational analysis, strategic/capacity planning and decision-making strengths.
- Possess excellent analytical, problem solving and organisational abilities.
- Conducting in-house testing & Inspection with personal involvement to Quality Assurance / Control.
- Developing and implementing Quality Control Procedures, plans, work instructions and method statements.
- Planning and participating audits at different phases of Project completion.
- Conducting periodic evaluation of vendor performance in terms of quality, delivery and service.
CORE COMPETENCIES
- Essayed a major role in monitoring of suppliers/contractors inspection activities relevant to the installation and testing of electrical and instrument ( E & I ) systems to ensure that Project installation and commissioning requirements are met and in respect to workmanship, quality, accuracy and safety.
- Demonstrated excellence in conducting I & E equipments installation / testing are carried out in compliance with Local statutory regulations and international codes & standards.
- Ensured strict adherence to the Contractor with the Project Hazard Area Classification requirements.
- Instrumental in verifying that the contractor adopts suitable procedures (ATEX Directive 94/9/EC, IEC 60073, IEC 60079, IEC 61508 and IEC 61511) for safe handling and packaging of I & E Equipments
- Maintained coordination and reviewing the work pack completion inspection and documentation required for final acceptance and contract close out.
- Addressed the requirements for Punch Listing ensues; develop work pack for Punch List close out. Ensure that the mechanical completion dossier is duly completed.
- Chalked out the requirements for preservation of the Instrumentation and Electrical installations prior to commissioning, start up and hand over of the work pack as part of a system
- Pivotal in reviewing the Inspection Reports and Certificates for completeness, adherence to requirements and verification of signatures. Accepts / Rejects the findings and instruct the contractors on the remedial action to be taken.
- Maintaining the comprehensive record of inspection carried out on contractors I & E installation and testing activities and provides feedback to QA/QC coordinator on progress/status, failure rates and non-conformities reports (NCR).
Last Resume Update | February 9, 2019 |
Address | Sohar, Oman |
aniillnair@gmail.com | |
Phone Number | +96891149574 |