RAMASWAMY TRITHALA ANANTHARAMAN

ELECTRICAL ENGINEER

Professional Experience:
Facility Engineer Manager --- Line Investments and Property LLC (Abu Dhabi) — August-- 2014 till March--2019.
• Managing the team of in house services, complying with the contract requirement agreed with the client.
• Developing management reports complying with the Capital replacement plan of the plants and equipments in line to the cycle routine.
• Ensuring and managing the preventive requirement to the equipments and plants and ensuring adherence to minimal break down time of the equipments in accordance with the contract.
• Formulation and implementation of Standard Operating Procedures for the services supporting the operations.
• Coordinating with the sub contractors with their assigned workers activities for the routine maintenance, planned preventive maintenance and break down maintenance.
• Manages and directing the work programs for the maintenance of building, plumbing, electrical, air conditioning, chillers, fire fighting systems, cctv systems and bms.
• Coordinating with the auditors in preparing the work flow audit management and monthly reporting of the operation.
• Submitting the quarterly reports of the planned preventive maintenance to the Abu Dhabi Municipality.
• Coordinating with the Mall Tenants, taking approvals for the shop renovation works with the consultant and Municipality.
• Responding appropriately to emergencies or urgent issues as they arise.
• Using performance management techniques to monitor and demonstrate achievements of agreed service levels and to lead and improve.
• Checking that agreed work by staff or contractors that has been completed satisfactorily and following up on any deficiencies.
• Overseeing the day to day operations of the team and acting as point of contact for the Management for all operational activities related to the team.
• Involved in Leasing of shops, coordinating with the Consultant and Municipality for completing the fit out work.
• Involved in marketing operations for increasing customers flow.
• Involved in preparing the yearly budget for the yearly operations.
• Involved in procurement of materials which is required for doing the preventive maintenance.
MEP Manager --- Line Investments and Property LLC (Abu Dhabi) — April 2008 until July 2014.
• Responsible to directly manage the safety, quality, and conformance of all MEP scope on the construction project.
• Planning and ensuring mechanical, plumbing and electrical installation as per approved drawings and material approvals.
• Supervising day today site operations.
• Preparation of documents for erection, testing and commissioning of all MEP systems which is as per the plan, shop drawings, specifications, standards and schedule.
• Ensuring that the work to be completed as per the time schedule and completing the snag list for the accomplished work.
• Preparing of bill of materials for the completed work.
• Project reporting, site coordination, client meeting presentation along with consultant.
• Installation of equipments for Plumbing, Electrical, Air Conditioning, Chillers, Chilled Water Pumps, Fire Fighting Systems, Domestic Water pumps, Generator, CCTV Systems and BMS.
• Quantity calculation as per BOQ/Tender, Invoicing, Estimation, Budgeting, Costing, Measurement works and Extra Items with rate analysis.
• Receive quotations, compare and negotiate.
• Monitor the consumption of materials with respect to the ordered materials.
• Ensuring the inspection request (RFI) is received for the consultant and client inspection.
• Liaising with consultant for material submission and approvals (RFA).
• Handling HSE audits and documents.
• Preparation and sub mission of shop drawings, as built drawings and O & M manual.
• Involved in Leasing of shops, coordinating with the Consultant and Municipality for completing the fit out work.
• Preparation of cable schedule, plant load test schedule and site survey report.
• Attends to Factory Witness Tests and ensures all equipment performance is to specifications to approved shop drawings and submittals.

Projects Completed:

• Expansion Project “Mandinat Zayed Shopping Centre And Gold Centre” Area 6000m2 in Abu Dhabi (April 2008—August 20o9).
• Expansion Project “Al Wahada Mall” Area :20000 m2 in Abu Dhabi (September 2009—January 2011).
• Turnkey Project “Mushriff Mall” Area: 56000 m2 in Abu Dhabi (February 2011—February 2013).
• Expansion Project “Ruwais Mall” Area: 15000 m2 in Abu Dhabi (March 2013— July 2014).

Electrical Engineer—Bahwan Engineering Company LLC (Oman) — March 2007 until December 2007.
• We were given in Man Power to Bechtel for execution of the Aluminum Plant Smelter Project in Sohar (Oman).
• Reporting to the Project Manager of Bechtel.
• With the approved drawings given from Bechtel works are to be executed.
• Ensuring the work processes are in compliance to the statutory requirement and in compliance to the authority’s regulation.
• Areas of implementation of work are in erection and installation of Aluminum Storage Yard equipments, lighting, over head crane, cooling tower equipments, Lv Panels with cabling along with testing and commissioning.
• Corporate HSE policy is strictly followed which is given by Bechtel before doing the work.
• Managing the man power, planning and coordinating the works with the Bechtel.
• Reconciliation of materials issued from Bechtel and handing over the balance material after execution of work.

Electrical Engineer—GEA Energy Systems LTD (India) for 330MW Power Plant in Dholpur — January 2006 until February 2007.
• Reporting to the Regional Director for the Project of the 330MW Power Plant.
• Coordinating with the contractors for the erection and installation of LV panels, cables, light fixtures, air condition, generators, and Bus Bay erection for switchyard along with capacitor banks.
• Responsible for planning, administration and labor management for all electrical and constructional jobs.
• Responsible for executing the work with safety procedures to ensure safe and healthy work atmosphere.
• Efficiently coordinate with the consultant as well as getting approvals for execution of works.
• Develop standard technical specifications and basic engineering drawings as well as 3-line diagrams, wiring and connection diagrams controlling schematic, lighting, grounding and race way layouts.
Site Engineer—Petron Engineering Construction PVT LTD — January 2001 until December 2005.
• Supervise the installation and erection of electrical, instrumentation equipments like HV/LV/MV switchgears, power transformers (110/10KV), distribution transformers (10/6.6KV, 6.6KV/440V).
• Handle HT /LT Motors up to 1310KW, battery bank, charger panels, PLC/DCS, UPS panel etc.
• Manage all kinds of earthing, industrial lighting, crane electrical wiring involving rail conductor installation, switch yard substation (relay and control panels) along with cable laying and termination both LT/HT cables.
• Planning, billing, scheduling manpower and also coordinate with clients consultant and sub contractors, handle project executions with large work force.
• Involve in job safety training and comply with all established rules and methods to ensure safe and healthy work atmosphere.
• Responsible in administration and labor management and knowledge in safety aspects towards all electrical and constructional jobs.

Projects Completed:

• M/s Ambuja Cement Plant, Maharashtra 50 MW captive power plant (Maratha
Cement Works) January 2001 to March 2002.

• M/s ACC Cement Plant co’s Ltd. Chanda Cement Works, 15 MW captive power plant Chandrapur, Maharashtra March2002 to December 2002.

• M/s Associated Cement Co’s Ltd., Tikaria Uttar Pradesh, 15 MW captive power plant January2003 to December 2003.

• M/s Associated Cement Co’s Ltd., Gagal Cement Works 15 MW captive power plant Barmana, Himachal Pradesh January2004 to December2004.

• Offsite Substations Works Panipat Refinery January2005 to December 2005

Last Resume Update May 17, 2019
Address UAE, United Arab Emirates
E-mail [email protected]
Phone Number 0544717067

Contact Candidate