
Mohamed Douma
A professionally qualified civil engineer with 8 years of experience . Construction and Construction Management
Construction Drawing, Structural Drawing, Architectural Drawing
Quantity and Bills
Q.C according to ACI and international norms and regulations
Specifications and Submittals
Precast Works And Installation
Scaffolding
Landscape
Post Tension
Internal design Execution
Piles works (shoring or pile caps), and Dewatering works.
Green building specifications and regulations (sustainability).
AutoCAD, SAP, Primavera P6.
Project Management Professional (PMP) Course.
FIDIC (conditions of contract for construction).
Microsoft Office, Web search and Email.
Languages: Native Arabic, English, Urdu (very good).
Present
Al Majal Engineering Consultant, Dubai, UAE, From Jan 2018
Civil Engineer (Labour Accommodation 5building (G+2) +2Services block+
multipurpose court areas and parking), Warsan 3, Dubai.
−The client: (Dubai Municipality).
−The contractor: (AlTurath Al Aseel).
−The project area: (27600 m2).
−Cost: (100 million AED).
Construction Manager (7 Residential buildings G+4+roof, Al Barsha3, Dubai),
the project is 3 plots each one is a two building compound with separate swimming
pool and parking.
−The client: (Al Ali Real states).
−The consultant: (Golden Square Engineering).
−Cost: (120 million AED).
Project Engineer (Residential Building 2B+11 F + HC + roof), Al Jadaf, Dubai.
−The client: (Al Rostamani Group).
−The consultant: (Arif & Bintoak Consulting).
−Cost: (70 million AED).
Project Engineer (Residential Building G + 7F + HC + roof), Dubai Silicon Oasis.
−The client: (Hapco Group).
−The consultant: (Mimar Emirates Engineering Consultants).
−Cost: (60 million AED).
Site Engineer (School of Research Science, Dubai), the project included working
on (3 swimming pool, 2 auditoriums, (3D) cinema ,2 cafeteria, 118 classrooms, 4
learning plaza, and A large area of landscape)
−The client: (Follow the scientific research schools).
−The consultant: (Bel-Yoahah Architectural & Engineering Consultants).
−The project area: (60000 m2).
−Cost: (220 million AED).
Al Amar Contracting Company, Cairo, Egypt from August 2011 to Jun 2012).
Site engineer(Altera compound, Cairo)
Carried out the structure of 2villas and finishing of 1 villa.
Last Resume Update | May 11, 2019 |
Address | Dubai, United Arab Emirates |
[email protected] | |
Phone Number | 0508807013 |